Minemax Scheduler 7.2.3 Release With Material Flow Diagram and More

Share This Post

Datamine is pleased to announce the new release of Minemax Scheduler 7.2.3 for strategic mine schedule optimisation that features new Material Flow Diagram reporting option, enhanced 3D view, Minemax Haulage improvements and licensing changes to support automatic detaching of network licenses for offline use.

This new release includes the following feature highlights:

New Material Flow Diagram Report

Mine planners can now access a new report that displays material movement between locations within a material flow diagram. This new report, previously introduced in Tempo for detailed mine planning, provides a quick and easy way to validate material movements between locations.

Enhanced 3D View with Triangulation Files

Mine planners can now load triangulation files such as surfaces and pit shells within the 3D View in the reserves menu and verify their reserve data in the context of geographical data.

Minemax Haulage Improvements

This release includes a new option to exclude locations from the configuration of Minemax Haulage which can be useful for haulage networks not covering all locations in a mining operation. With this enhancement, users can calculate cycle times for some locations and import cycle times for others, all within the same project.

In addition, a new validation option allows users to verify that haulage routes between locations and configured haulage strings are correct before importing.

Licensing Changes for Automatic Detaching

Minemax Scheduler now supports automatic detaching of license seats from software-based network licenses. When the ‘Automatic Detaching of Licenses’ option is enabled, a license seat is automatically detached from the network license and attached to the local machine, for a specified number of hours, whenever a license is required. This allows users to continue working even if the machine loses its connection to the network license.

The new version is now available for all maintained and subscribed users through the Minemax Software Manager (MSM).

Minemax Scheduler’s strategic mine schedule optimization technology has been relied upon by mining companies for over 20 years to optimize the net present value of their mineral assets. With mine schedule optimization, cut-off grade optimization, haulage optimization and capital expenditure optimization, it provides organizations with more value levers than any other available solution. Together with members of the Datamine Software Group, Minemax delivers high quality software solutions and advisory services to customer in over 100 countries.

For more details on this new release, contact our mining consultants who are always happy to discuss any specific requirements.

Latest Posts

Blog

Insights from Kestel v Kimminco

JV dispute over Cu Deposit near Horizontal Falls In Kestel Superannuation Pty Ltd v Kimminco Pty Ltd ([2024] WAWC 2), the Western Australian Warden’s Court dealt with a multifaceted legal dispute that involved mining joint ventures, and the enforcement of a Settlement Deed that was designed to resolve prior conflicts. There are questions about the court’s jurisdiction,

Software Release

Minemax Scheduler 7.7

Practical Strategic Schedules Optimizing schedules to maximize Net Present Value (NPV) often involves extracting resources from multiple pits, but frequently relocating equipment between these pits is impractical. That’s where Minemax Scheduler 7.7 comes in. We’ve introduced a new feature that allows you to limit the number of pits and pit groups open at the end

Scroll to Top